Apply for approval in the simplified procedure for an installation in accordance with the BImSchG (Federal Immission Control Act)
Are you applying for a permit for installations under the simplified procedure? Then you can obtain a permit from the competent authority for the construction and operation of installations of a certain type or scope without public participation.
-
Basic information
Permits for installations of a certain type or scope can be issued in a simplified procedure. In these cases, the procedure is carried out without public participation.
You will receive a permit if you fulfill the obligations under the Federal Immission Control Act and the project does not conflict with any other public law regulations.
The cases in which a simplified approval procedure is possible can be found in the legal basis.
Requirements
- You must prove that you will comply with the obligations of the Federal Immission Control Act when constructing and operating a plant.
- No other public law regulations or occupational health and safety concerns stand in the way of the project.
-
Procedure
- You sign and submit the above documents to the authority
- The competent authority confirms receipt of the documents and informs you which additional documents it needs to assess the requirements.
- You can only start work on your project once you have received the permit.
Online application:
- Use the online service.
- Please log in with your access data via the Gemeinsam-Online service account or register first.
- ELiA-Online is a form-based online service that can also be used to attach additional documents (expert reports, drawings, etc.) to the application or notification using the upload function.
-
Necessary Documents
- ELiA forms
- (Electronic immission control application), available on the website of the Trade Supervisory Authority of the State of Bremen
- Required drawings, plans or expert opinions
- Explanatory notes on the system
- Other documents
- If necessary, ask the competent authority
- ELiA forms
-
Online Services
-
ELiA-Online - Electronic application under immission control law
You would like to construct or modify an installation that requires a permit. Then you can create the necessary applications or notifications digitally here in the "ELiA-Online" online service and submit them to the responsible authority.
-
-
Fees / Costs
The fees depend on the individual case. They are based on the Environmental Administration Cost Ordinance (UmwKostV).
-
Deadlines & processing time
What deadlines must be paid attention to?
Before construction of the plant.
How long does it take to process
3 months From the time the documents are complete. The competent authority may extend the deadline by three months.
-
Legal Bases
- § 19 Gesetz zum Schutz vor schädlichen Umwelteinwirkungen durch Luftverunreinigungen, Geräusche, Erschütterungen und ähnliche Vorgänge (Bundes-Immissionsschutzgesetz BImSchG)
- Vierte Verordnung zur Durchführung des Bundes-Immissionsschutzgesetzes (Verordnung über genehmigungsbedürftige Anlagen - 4. BImSchV) Anhang 1
- Kostenverordnung der Umweltverwaltung (UmwKostV)
This page has been automatically translated by DeepL. We cannot guarantee that the translation is correct.
The official information in German is complete and correct. 26.02.2026